Project Name: Bridge road pavement renewal
Proposed Status: Construct in 2020/21
Previous Status: No change
Proposed Budget: $374,000
Project Objective: Asset renewal
Project Justification: The pavement, seal and kerb assets are in poor condition and require renewal. This is a critical transport asset on the road link between the Bass Strait ferry terminal and the CBD
Project Scope: It is proposed to renew the kerb on each side of the road and renew the road between 3 and 13 Bridge Road. Subsoil drains will be installed where possible and minor drainage improvements may be required.