Bridge road pavement renewal

Project Name:                     Bridge road pavement renewal

Proposed Status:               Construct in 2020/21

Previous Status:                 No change

Proposed Budget:              $374,000

Project Objective:              Asset renewal

Project Justification:        The pavement, seal and kerb assets are in poor condition and require renewal. This is a critical transport asset on the road link between the Bass Strait ferry terminal and the CBD

Project Scope:                       It is proposed to renew the kerb on each side of the road and renew the road between 3 and 13 Bridge Road.  Subsoil drains will be installed where possible and minor drainage improvements may be required.

 

 

 

Current Works & Projects

Bluff Headland – Handrail replacement and extension

The southern part of the path has a handrail, but a risk assessment has recommended that the handrail be extended to reduce the risk of falls. In addition, the existing handrail is approaching end of life and should be renewed at the same time.

Read More →
Current Works & Projects

298 Bellamy Road stormwater improvements

The project involves construction of new headwalls both upstream and downstream and extend the pipe downstream.

Read More →
Current Works & Projects

Mersey Main Road Stadium Crossing

Existing refuge island is inadequate to protect vulnerable road users as they attempt to cross busy Mersey Main Road against a peak traffic volume of 14,000 vehicle per day.

Read More →