Bridge road pavement renewal

Project Name:                     Bridge road pavement renewal

Proposed Status:               Construct in 2020/21

Previous Status:                 No change

Proposed Budget:              $374,000

Project Objective:              Asset renewal

Project Justification:        The pavement, seal and kerb assets are in poor condition and require renewal. This is a critical transport asset on the road link between the Bass Strait ferry terminal and the CBD

Project Scope:                       It is proposed to renew the kerb on each side of the road and renew the road between 3 and 13 Bridge Road.  Subsoil drains will be installed where possible and minor drainage improvements may be required.