Project Details:
Project Name: | Pipe Renewal – 23 Steele St |
Proposed Status: | Construction in 2021/22 |
Previous Status: | Construction in 2020/21 |
Proposed Budget: | $60,000 |
Project Objective: | Asset renewal |
Project Scope: | Reline entire length of pipe D007170, D007800 and D007801. Consistent patching required over 80m of 225RCP due to holes on top of pipe, wall cracks and unknown infiltration |