Project Name: | Tugrah Road – (Rundle Road to Stony Rise Road) – stormwater renewal |
Status: | Construction in 2021-22 |
Previous Status: | NA |
Budget: | $75,000 |
Project Objective: | Asset renewal |
Project justification: | This allocation is required to renew of a damaged stormwater line identified via asset inspection work. |
Project Scope: | Reline 100m of the existing 750mm diameter pipe (D009651) to stop root infiltration and ensure ongoing function of the network. |