Search
Close this search box.

Tugrah Road (Rundle Road to Stony Rise Road) – stormwater renewal

Project details:

Project Name:
Tugrah Road – (Rundle Road to Stony Rise Road) – stormwater renewal
Status:
Construction in 2021-22
Previous Status:
NA
Budget:
$75,000
Project Objective:
Asset renewal
Project justification:
This allocation is required to renew of a damaged stormwater line identified via asset inspection work.
Project Scope: 
Reline 100m of the existing 750mm diameter pipe (D009651) to stop root infiltration and ensure ongoing function of the network.

Project Photos: