Project Name:                     Victoria Parade – Cenotaph – Base Surface Renewal

Proposed Status:                Construction 19/20

Previous Status:                  Not previously listed

Proposed Budget:              $10,000

Project objective:              Asset renewal

 Project justification:      The internal path that surrounds the Cenotaph is in poor condition with cracking and uneven surfaces

Project scope:                    The existing surface has been overlayed and requires removal with a new surface, applied in hot mix or paving