Project Name:                     Tugrah Road Drainage

 Proposed Status:                Construct in 2019-20

Previous Status:                  No change

Proposed Budget:              $40,000

Project Objective:              Extend Council’s stormwater system to transfer runoff from approved discharge point to the Don River

Project Justification:         This project is required as the properties that front Tugrah Road were approved to discharge to the rear of their properties at the time they were constructed.  However, there was no functional stormwater system between this point and the Don River, which has caused a nuisance for the downstream property owner.

Project Scope:                     Install SW drain through #130 from existing 225 pipe to Don River