Project Name: Pipe Renewal – 23 Steele St
Proposed Status: Construction in 2020/21
Previous Status: No change
Proposed Budget: $60,000
Project Objective: Asset renewal
Project Justification: This allocation is required for renewal of a damaged line
Project Scope: Reline entire length of pipe D007170, D007800 and D007801. Consistent patching required over 80m of 225RCP due to holes on top of pipe, wall cracks and unknown infiltration