Project Name:                     Kelcey Tier Road – Pipe Extension and Headwall

Proposed Status:                Construct in 2019-20

Previous Status:                  No change

Proposed Budget:              $20,000

Project Objective:              Prevent roadside erosion and instability (ref STM18.0045)

Project Justification:         This project is proposed to reduce potential for local road failure. Steep drop-off right next to road edge.

 Project Scope:                     Extend 900 diameter culvert by around 1m.  Construct headwall to retain road and shoulder