Project Details:
Project Name: | Bridge Road – pavement renewal |
Proposed Status: | Complete |
Previous Status: | Construct in 2020/21 |
Proposed Budget: | $374,000 |
Project Objective: | Asset renewal |
Project Justification: | The pavement, seal and kerb assets are in poor condition and require renewal. This is a critical transport asset on the road link between the Bass Strait ferry terminal and the CBD |
Project Scope: | It is proposed to renew the kerb on each side of the road and renew the road between 3 and 13 Bridge Road. Subsoil drains will be installed where possible and minor drainage improvements may be required. |