Bridge Road – pavement renewal

Project Details:

Project Name:
Bridge Road – pavement renewal
Proposed Status:
Complete
Previous Status:
Construct in 2020/21
Proposed Budget:
$374,000
Project Objective:
Asset renewal
Project Justification:
The pavement, seal and kerb assets are in poor condition and require renewal. This is a critical transport asset on the road link between the Bass Strait ferry terminal and the CBD
Project Scope: 
It is proposed to renew the kerb on each side of the road and renew the road between 3 and 13 Bridge Road.  Subsoil drains will be installed where possible and minor drainage improvements may be required.