Bluff Headland – Handrail replacement and extension

Project Name:                      Bluff Headland – handrail replacement and extension

Proposed Status:                Construction in 2020/21

Previous Status:                  Not previously listed

Proposed Budget:              $45,000 funded by grant from Drought Impact Program

Project objective:              Asset upgrade – safety

Project justification:       The path between Bluff Beach and the Lighthouse is in some areas close to the edge of the rock cliff. The southern part of the path has a handrail, but a risk assessment has recommended that the handrail be extended to reduce the risk of falls. In addition, the existing handrail is approaching end of life and should be renewed at the same time.

Project scope:                  Renew existing fence and extend 20m to reduce the risk of falls

Current Works & Projects

298 Bellamy Road stormwater improvements

The project involves construction of new headwalls both upstream and downstream and extend the pipe downstream.

Read More →
Current Works & Projects

Mersey Main Road Stadium Crossing

Existing refuge island is inadequate to protect vulnerable road users as they attempt to cross busy Mersey Main Road against a peak traffic volume of 14,000 vehicle per day.

Read More →
Current Works & Projects

Pipe Renewal – 23 Steele St

This allocation is required for renewal of a damaged line.

Read More →